In late July of 2009 a new white tin roof was put on the Travelers Hotel. The reason the Hotel was in such terrible shape when we bought it is because the roof had leaked for many, many years - so a new roof was the first thing on our list of priorities. We ordered the tin from Jorgenson's Lumber in Power's Lake and they delivered it. Doug Johnson of Portal Service came with his crane to help us lift the huge heavy stack of tin up onto the roof. There were fourteen 3' x 35' long sheets and eleven 3' x 27' sheets.
We laid down the shorter 27' sheets of tin on the narrower east side first. The chimney on the south side for the coal furnace was removed as it was falling in and the tin was laid over the hole. |
In preparation for the new roof, we patched some of the worst holes with tar. The last 3' of roofing on the east side of the hotel was deteriorated so badly that Dave cut it off and replaced it with new plywood. He also put a new double row of 2 x 10s underneath the roof on the east side to hold it up.
Dave put down 1" x 4" fir strips at 2' intervals across the whole roof and the tin was then screwed to the strips. It didn't take long to get the whole roof done, three or four days at the most. Dave and I did most of it ourselves, with some help from Jim Hill, Taylor Verlinde, Mitch James and Roland Zimmerman. The weather cooperated and it didn't rain on us, which is a miracle considering how much it rained that summer. We finished it just before another summer rain.
This is Dave working on the brick around the chimney in preparation of laying the tin. The chimney on the other side of the roof was removed. |
Dave, almost finished... that's alot of screws!!!!